Tuesday, November 20, 2012

Re-Laminate Counters

The client was looking to modernize their bathroom counters and sinks with something a little more aesthetically pleasing.

Before

After

Parking Lot Lines

BEFORE: Lines were faded in outdoor parking lot.

After: Repainted lines with Exterior Traffic paint. Taped to ensure crisp, clean lines. 


Drywall Patch, Painting

Before: This client had some water damage from an office window that was not properly sealed. After they replaced the window, they needed some drywall and insulation installed.

After: This is the wall, near completion. This photo was taken during the painting process.


Friday, November 16, 2012

Vinyl Deck Repair

BEFORE: This deck had some small tears in it, which caused the plywood underneath to rot.

AFTER: We removed the vinyl decking, replaced the rotted plywood, and installed a new DecTec membrane. 
The membrane is double heat-seamed and sealed waterproof as per manufacturer specifications.